Contact Us
 
Products and ServicesProducts Pump/Dispenser Calibration Wednesday, September 08, 2010
 

product-&-Services.jpg

 

Pump/Dispenser Calibration

 

Scheduling Stage:


  • Data input to Helpdesk system 
  • Monthly schedule
  • Reports to Metrology
  • Send letter for requested Annual Inspection
Facilities 001.jpg

Pump Calibration Stage:


1. On site Preparation of Borang “E”

 

2. Planning and preparation for Calibration

Measuring Tools preparation includes measuring can (10 Litres), Ministry Seal and Seal Cutter

 

3. Open up pump cover


4. Preset amount of fuel to 10


5. Dispense the petrol/diesel into the 10 liters' measuring can to ensure that the volume is within the tolerance ( 10 to 50ml)


6. Cut the old seal and adjust the calibration adjustor to get the volume of fuel within the tolerance

 

7A. Not within  Tolerance

Ministry inspector will seal the adjustor once the volume of fuel being dispensed is accurate/within tolerance

 

7B. Within Tolerance

Cut the old seal and the ministry inspector will seal the calibration adjustor with a new seal

 

103_3517-edit.jpg

Group Photo 6.jpg

Handover Stage:


  • Close up pump cover
  • Ministry will provide the sticker of the calibration and next calibration date for the pump
  • The sticker will be sticked on the top panel above the visigauge
  • Product ready to sales to Customer

 

Back To Product Main Page  

Privacy Statement | Terms Of Use
2010 ©Copyrights Reserved by Hexagon Holdings Berhad