|
|
 |
 |
|
| |

|
Pump Dispenser (External / Internal)
• Equipment maximum uptime
• Upkeep of Equipment
• Timely repair and handover
• MTBF-Mean Time Before Failures analysis for best selection of equipment
Fill / Dip Points & Bulk Storage Tanks
• Fill Points
• Dip Points
• Vent Pipe
• Accessories of Equipment
|


|
|
Leak Detector Testing
• To ensure that sub pump leak detectors are installed and functioning correctly
Manways, Drainage & Oil / Water Seperator System
§ To check the condition of manway covers and pits and to ensure that external product identification tags are present and no fuel is in the manway.
§ To ensure that the drainage system, including all surface drains and sumps are functional and in good condition.
§ To ensure that the Oil/Water Separator system is fully operational and to check for the presence of fuel, rubbish or excessive sediment. |


|
|
Upkeep of Building
• Forecourt concrete
• Canopy Waterproof
• Paint Work
• Building & Toilet Renovation
• Dispenser / Dispensing Island Renovation
• Station Entrance & Exit Tar Road Replacement
• PBuilding Adequate Drainage
• Building Grounding System (Lightning Arrestor)
Upkeep & Cleaning of Signage
• Canopy
• Monolith
• Sky Sign
• Arrow Sign IN / OUT
Convenient Store
• Upkeep / Upgrade of Equipment
• Remodeling of Shop
• Energy Conservation Management |


|
|
Electrical
• Power supply: - DB box, MCB, ELCB
• Underground power supply cables
• Data cables
• Station Lighting Works
• Lightning arrestor
• Power surge protector
• Energy conservation management |

|
Back to Top
|
|
|
|
|
|
|
|
|